Scheduling

  • It is recommended that the wire guidance is scheduled after the rack has been installed and bolted in place.
  • The aisles to be wire guided, along with 15ft beyond end of racking, should be free and clear of any obstructions.
  • The facility should have adequate lighting and ambient temperature, (minimum of 50 degrees).
  • There must be a water tap on site with sufficient volume and pressure.
  • There must be a location at the site for the pouring off of the cutting and cleaning water. If that is not feasible, other arrangements will need to be made with Trueline.